KENAI PENINSULA BOROUGH

LEGISLATIVE PRIORITIES FOR 2000

      Projects for Public Schools and Facilities.      

School Categories
    1.  Life/Safety
    2.  Maintenance
    3.  Recognized Needs

House District 7.

Priority Facility Category Project Cost
1 Homer High 1 Structural Repair @ $250,000
2 District Wide 1 Asbestos Abatement - $83,000
3 District Wide 1 Playground Safety - $42,600
4 McNeil Canyon 1 Replace Waste Treatment $105,000
5 District Wide 1 ADA, Handicapped Door $90,000
6 District Wide 2 Flooring Replacement $90,000
7 District Wide 3 Portable & Outbldg. $83,000
8 Tustumena Ele. 2 Roof Drains & Drywells $40,000
9 Seldovia 2 Replace Black Heat Piping $120,000
10 Chapman Ele. 2 Re-roof Section "B" ('69) $105,000
11 Nanwalek 1 Replace Elevator $200,000
12 Seldovia 2 Re-roof B & C ('72) $141,000
13 Seldovia 2 Re-roof D & E $139,000
14 Seldovia 2 Re-roof F & G $70,000
15 Seldovia 2 Re-roof A $258,000
16 District Wide 1 Computer Electrical $30,000
17 Homer Middle 1 Auto Transfer Switch @ $14,000
18 Seldovia 1 Replace Pool Sand Filters $28,000
19 Paul Banks 2 Re-roof C ('75) $62,000
20 Chapman Ele. 2 Replace Intercom $13,000
21 Seldovia 2 Replace Intercom $18,000
22 Homer High 2 Blast & Reseal Exterior Brick $64,000
23 Nanwalek 2 Re-roof School & $300,000
24 Port Graham 2 Re-shingle Roof & $82,000
25 Chapman Ele. 2 Refinish Gym Floor $14,000
26 Chapman Ele. 1 Replace Bleachers $26,000
27 Seldovia 1 Replace Bleachers $30,000
28 Nikolaevsk 3 Gym Expansion, Locker $900,000
29 Homer Middle 3 Upper Playfield Construction $240,000
30 District Wide 2 Locker Replacements $40,000
31 Homer High 2 Convert Outside Storage to $160,000
32 Katchemak Selo 1 Replace Primary Building $130,000
Total $3,967,600

KENAI PENINSULA BOROUGH

LEGISLATIVE PRIORITIES FOR 2000

Projects for Public Schools and Facilities.

House District 8.

Priority Facility Category Project Cost
1 District Wide 1 Asbestos Abatement - $83,000
2 District Wide 1 Playground Safety - $42,600
4 District Wide 1 ADA, Handicap Door $90,000
5 Seward Middle 1 Electrical Upgrades @ $30,000
6 Moose Pass 1 Water Purification System $10,000
7 Soldotna Middle 1 Upgrade Shop Ventilation $16,000
8 Seward Mid/High 1 Replace Emergency $10,000
9 District Wide 1 Computer Electrical $30,000
10 Soldotna Middle 2 Re-roof A,B,C,D,E,F,G & $680,000
11 District Wide 2 Flooring Replacement $90,000
12 District Wide 2 Portable & Outbldg $83,000
13 District Admin Bldg 1 Upgrade Ventilation $80,000
14 Moose Pass 2 Re-roof All $130,000
15 Skyview High 2 Water Hammer $20,000
16 Moose Pass 1 Upgrade Domestic Water $20,000
17 Seward Ele 2 Replace Fuel Oil Day $15,000
18 Seward Middle 2 Re-roof A,B, & C ('70) $195,000
19 Seward High 1 Replace Gym Bleachers $99,000
20 Sterling Ele 2 Re-roof A ('68) $59,000
21 S.D. Warehouse 1 Walk-in Freezer $275,000
22 Seward High 2 Upgrade Heating Controls $41,000
23 Soldotna High 2 Boiler Replacements x 2 $193,000
24 Soldotna Middle 2 Replace Intercom $18,000
25 Redoubt Ele 2 Abate & Replace Boilers x $68,000
26 Soldotna Ele 2 Renovate Gym Lighting $20,000
27 Soldotna High 2 Upgrade Heating Controls $10,000
28 Soldotna Ele 1 Install Crawl Space $20,000
29 Redoubt Ele 2 Re-roof A & B ('78) $641,000
30 K-Beach Ele 1 Construct Bus $150,000
31 District Wide 2 Locker Replacements $40,000
32 Skyview High 2 Classroom Expansion $680,000
Total $3,938,600

KENAI PENINSULA BOROUGH

LEGISLATIVE PRIORITIES FOR 2000

Projects for Public Schools and Facilities.

House District 9.

Priority Facility Category Project Cost
1 District Wide 1 Asbestos Abatement - $83,000
2 District Wide 1 Playground Safety - $42,600
3 Kenai High 1 Crosswalk Lights to Voc $80,000
4 District Wide 1 ADA, Handicap Door $90,000
5 Nikiski Ele 2 Re-roof Section B $96,000
6 Sears Ele 2 Re-roof Section A $56,000
12 Bartlett 2 Re-roof "C" $222,000
13 Bartlett 2 Re-roof "A" $104,000
14 Bartlett 2 Re-roof "B" $109,000
15 District Wide 2 Flooring Replacement $90,000
16 District Wide 3 Portable & Outbldg $83,000
17 Bartlett 1 Auto Transfer Switch @ $14,000
18 District Wide 1 Computer Electrical $30,000
19 Nikiski High 2 Water Hammer $20,000
20 Kenai Middle 2 Re-roof "G" $479,000
21 Kenai Middle 2 Re-roof "A,B,D,E & F" $390,000
22 Kenai Middle 2 Re-roof "C" $260,000
23 Kenai High 2 Reinsulate Exterior Walls $500,000
24 Bartlett 2 Heat Controls Upgrades $38,000
25 Kenai Middle 2 Replace Intercom System $17,000
26 Nikiski Ele 2 ADA Toilet Room $20,000
27 Kenai High 2 Replace Flooring @ $65,000
28 Sears Ele 1 Relocate Office & Admin $60,000
29 Kenai High 2 Replace Auditorium Light $60,000
30 Kenai High 2 Replace Auditorium $35,000
31 Nikiski Ele 2 Re-roof "C" $89,000
33 Nikiski High 2 Reseal Track and $29,000
34 District Wide 2 Locker Replacements $40,000
Total $3,201,600