KENAI PENINSULA BOROUGH 2004-2006 STIP PRIORITIES
1. Echo Lake Road Rehabilitation, Soldotna
2. Jones Stub Road Reconstruction, Soldotna
3. North Fork Road Rehabilitation (MP 8.5-17), Anchor Point
4. Scout Lake Loop Road Separated Pathway, Sterling
5. Sterling Highway/Midway Drive Intersection Reconstruction, Sterling
6. Kalifornsky Beach Road Rehabilitation (MP 0-16.4), Kenai Upgrade #13579
7. Keystone Drive (Mile 2-5), Soldotna Upgrade #2642
8. Lowell Point Road, Reconstruction, Seward Upgrade #2624
9. North Fork Road Separated Pathway (Mile 0-8.5), Anchor Point Upgrade #14959
10. Seldovia Airport Reconstruction, Seldovia Upgrade #5957
11. Voznesenka Road Reconstruction, Homer Upgrade #2343